This week the team put up the first plate on the wall! First, they removed the clips from the conduit and strapped them in place to the scaffolding legs. This allowed the team to slide the plates behind the conduit and into place, and temporarily fix them to the wall with washers and tapcons anchors. In order to use the plate as a drilling template. The tapcons were removed once the first set of rods were cured and ready to receive washers and nuts. After all were done, the rods were cut to the desired length and tightened further with a torque wrench.


This week the walkway grate was delivered! Once all the walkway structure is up, there will be dropped in place.