The Horseshoe Farm fellows and Dr. Dorsey came out on Sunday and helped prime and scrape the remaining of the block walls. By the end of the day, most of the Beacon Alley wall was primed and a coat of fresh paint put on the other wall!

The team finished installing the new waterlines and aligning the shut-off valve boxes at the north end of the site, as well as adding a connection for a water hose during construction.

This week Luis also came down from Columbiana, Alabama, and volunteered his time with the team. Luis is a certified welder, and one of the people that taught the team how to weld at Jim Turnipseed’s shop. After the galvanization was ground off at the bottom of the bracket connection, Luis welded the plates to the tube in order to make a stiffer connection.

Mason helping deliver the cut grate to the site. Up next grate installation!