With things picking up in the Studio entering fall semester, convocation, and neckdowns, we were working with a tight deadline for when the boom truck was booked to raise trusses before the chaos started.
While building the trusses, we did a series of physical and sketch studies to test column composition and location and hardware for the splices. Once the trusses were finished, we moved into column construction focusing on how to make the three plys as tight as possible and create a structural and aesthetically pleasing screw pattern.

Moving between the woodshop building columns and site, we began to place and steel feet on the column footings and drill holes for anchor bolts. We located each footing focusing on centering them along truss lines so that the truss can slide into the column. We then set the threaded rod using apoxy and set leveling nuts to ensure the steel plates were all sitting at the same height.

Truss raising day finally came (after weeks of stress dreams and some long days). With the generous help from West Alabama Mechanical and United Rentals for a scissor lift and man lift, we were able to get all of the trusses up in a day! Seeing the structure raised and beginning to understand some of the spatial aspects of the pavilion in real life has been a big boost in the project for us.