fabricationpavilion

Fabrication Pavilion Pinup Space and Storage

Back to school is right around the corner—just in time for the new Rural Studio pinup space! Over the past two months, the Fabrication Pavilion has had a serious update. One of its shear walls has been transformed into storage and very luxurious outdoor pinup space with its own weather screen protection.

Someone Has Framed Us!

In our last update, we tilted the northern and southern walls into place, and installed the header beams to span the 16-foot distance between them. This beam serves many purposes in the design. It is a parapet wall around the perimeter, structure for the top plate, and a surface for the storage doors to close on to. After that, we framed the roof, taking care that the heights matched on both sides of the shear wall. A center column was installed under the header beam, resulting in two separate door openings.

Next, we closed the box, cladding the walls and roof in plywood.

Raise the Roof

Due to its low slope, the team found the best way to waterproof the roof was to use a Peel-and-Stick system. First, we painted the whole surface with an asphalt primer. Then, we laid the underlayment and roofing membrane. We took great care to seal the gaps between the shear wall and the roof framing.

Shocking Developments

We ran conduit from the existing breaker box to lights and outlets along the outer walls. These outlets will provide easy access to use power tools and of course provide a convenient place to plug in a screen for presentations.

A Jamb-Packed Experience

Now, we have our walls, but where are the doors?

The storage space doors are NOT small, being three feet wide and ten feet tall. This size allows easy tool access and makes for fewer joints / interruptions in the Homosote pinup board walls. The doors metal frames were fabricated off site, out of steel. The team consulted with Chicago Brass to spec the appropriate hinges and door hardware, then created a set of fabrication drawings for the rigid steel doorframes with integrated handles, designed to accommodate the attachment of exterior materials and a central pivot hinge. The pivot position allows the door to be flush to the exterior wall when closed. Structural engineer, Joe Farruggia, suggested we support the doors with a steel top plate that would hold the pivot hinge vertical and support the doors.

Fabrication

Anna had the wonderful opportunity to participate in the fabrication of the doors at her dad’s fabrication shop, Leach & Company in Gadsden, AL, creating plasma cutting files, cutting holes for the attachment of door hardware, and welding the pieces into frames.

Installation

Afterwards, we brought the frames to Newbern and bolted them into the concrete slab. We positioned the pivot hinges carefully to ensure a balanced swing for the doors.

We installed wood to the threaded rods on the inner surface of the door frames to attach plywood. The doors and walls were all clad with plywood and dimpleboard. Dimpleboard creates an air gap that will allow the plywood and Homasote to dry out if hit by wind driven rain.

A Hole Ordeal

Shortly after the delivery of the doors, the perforated aluminum for the screen arrived. The screen covers two bays, to offer wind, glare, sun and driven rain protection. The two bays are a test, something we can live with for a bit, before investing in the rest of the south side of the pavilion. The process of installing the screen began with the columns. Three columns had a long Unistrut channel installed vertically along their outer faces. The 18-foot aluminum panels were mounted to the Unistrut using spring-loaded channel nuts. The team installed them from bottom to top so that water can run down the screen’s surface.

All It’s Pinned Up To Be

Finally, the team installed the finish materials and accessory utilities. The team marked out the placement of all the screws using a jig, so that the surface would remain consistent across all sides. Then, we installed flashing along the bottom of the walls and the Homasote above. The material continuity around the storage allows the doors to blend in allowing the pinup walls to feel like one continuous surface wrapping around the shear wall.

The steel top plate wraps down the southern side, and is fully clad in the gray metal. This creates a separate utility area between the south side of the pinup space and the translucent screen. The team installed custom hooks for storage. The space is equipped with safety equipment, first aid kits, cleaning supplies, and a water spigot.

A set of outdoor utility lights with custom steel shades was installed last. We mounted the lights facing upwards, allowing the light to reflect off the ceiling and wash down the Homasote walls. This indirect lighting diminishes glare while enabling clear viewing of drawings after sunset.

Now, you may be wondering what we’ve decided to name the space… Being a campus project, we thought that it would be appropriate to let the students users decide what it should be called. So we put up a plaque inside the structure with a list of possibilities. Which one is your favorite?

First Presentation

We wrapped up construction with a celebratory lunch with our families, faculty, and all the new students here for the Fall 2024 semester. After a delicious meal of catfish, everyone gathered in the Fabrication Pavilion for the space’s first presentation. We walked through the whole process of the project’s design and construction and showed off construction drawings and renderings.

There’s still work to be done repairing the Fabrication Pavilion roof, but we are proud to present the end of this phase of the project. We will have a grand opening when the roof is completed.

Acknowledgements list:

Dan Wheeler, Joe Farruggia, Thomas Paterson, Angelo at Chicago Brass, and William Leach

With Strong Steel and Friendship: It’s All Column Together

It’s time for another check-in on the Rural Studio Fabrication Pavilion. We have been working on column repairs, construction plans, and new structural ideas. In addition, we’ve been reevaluating our goals for weather screens on campus.

Column Construction

In the last month, we replaced the splice plates on the final sets of columns. With the help of the CLT Core House team and the 3rd-years, we were able to transport and disassemble the excess scaffolding. Now the slab is clear for the next phase of the renovation: the roof.

Raising the Roof

The main dilemma of repairing the Fabrication Pavilion roof is what the new structure will be made of. The roof acts as a diaphragm that links all the trusses in the Pavilion together, allowing them to act as one. So, the new roof needs to be strong and able to span the distance between each truss. It must also achieve our aesthetic goals for the project. After working through full-sized detail drawings with our professors and guest consultants like Dan Wheeler, we concluded that our best option for ceiling material is structural metal decking.

The Shear Possibilities

As we consider the design of our western extension, our team has decided to expand on what Rural Studio has learned about bypass construction from the original Pavilion. Rather than making the structure out of large, heavy pieces, we will use an aggregation of smaller steel members joined with through bolt connections. Using smaller pieces to create a larger system will make the construction process easier for our team. This method will also allow us to make consistent column connections to other parts of the structure, such as the roof and weather screen.

We plan to remove the Fabrication Pavilion’s western shear wall to open up the space around the loading dock. As a result of this decision, the new steel structure needs to be rigid enough to replace it. After a conversation with our structural engineer, we have begun using ENERCALC to refine our ideas, especially through testing the shear capabilities of each of our structural column schemes. This testing has resulted in the design of a vertical column truss that can handle the building’s heavy wind loads.

Don’t Forget Your Sunscreen

Over the past month, we have been working through a variety of weather screen designs. We have evaluated each idea’s materiality, rain protection, and resultant light quality. Recently, we have been experimenting with schemes that cover a larger portion of the south side of the Fabrication Pavilion. This approach will provide protection from our most aggressive rain as well as create a ‘theater of construction’ that can be seen from Morrisette House.

Stay tuned to see what is to come, and see you at Pig Roast!

Introducing… The Fabulous Pavilion

Braces, Splices, and Trusses, oh my!

The 5th-year students have been in Hale for a couple months working as a team of eight on two new projects: the Fabrication Pavilion and CLT Core House. Now we are excited to finally introduce you to the new 2023 Fabrication Pavilion team!

Polaroid photos of (left to right) Tatum DeBardeleben, Marcelo Aldrete, Anna Leach, and Laura Forrest

Tatum DeBardeleben is from Auburn, Alabama. She used to be an equestrian camp counselor and is a lover of wooden utensils.

Marcelo Aldrete comes all the way from Austin, Texas. He is a former builder of tiny homes and a proud bearded dragon dad.

Anna Leach is from Gadsden, Alabama. She loves twirling flaming batons and is an aquarium enthusiast.

Laura Forrest hails from Corner, Alabama. She has been a roller-skating carhop and has a cat who likes high-fiving.

Our Challenge

We have been challenged to pick up where the 2015 Fabrication Pavilion team left off. We will be renovating the structure so that it can continue to serve Rural Studio for years to come. This task includes making some structural repairs to the existing building, planning for an extension, and making changes to the layout of campus so that the Pavilion works as effectively as possible.

Workshopping It Out

Since August, we have had a variety of workshops to explore options for the Fabrication Pavilion with our guests. We began with site planning—balancing the need for student, faculty, and trailer parking with vehicle clearances and turnarounds for deliveries—along with determining the best placement for a new pole barn for storage on campus.

The team also did a story-poling exercise to test out different locations and sizes for possible additions to the Fabrication Pavilion.

Additionally, the entire class accompanied Frank Harmon and Dan Wheeler around Greensboro and Newbern for a sketching and watercolor workshop, with subjects ranging from Morrisette House to Marcelo’s own apartment to Andrew Freear’s wallet! This workshop focused on sketching as a tool for memory, study, and seeing.

Watercolor Perspective of the Great Hall at Morisette House by Tatum DeBardeleben
A beautiful day to watercolor

Under Repair

Under the instruction of our teachers and structural engineer, we have been constructing scaffolding and bracing for the Fabrication Pavilion’s columns. In the next week, we will begin repairing the columns by removing the original wooden blocking and replacing it with larger galvanized steel tubing.

Looks Like We Have Another Review on Our Hands

This past Friday, we got all dressed up for Halloween Reviews as the Scooby-Doo gang, complete with our own Fabrication Pavilion Mystery Machine. This review gave us much-needed insight into our schemes. We have been encouraged to look deeper into the possibilities of what the Fabrication Pavilion can become and to experiment further.

We’re looking forward to seeing how this space evolves from how it has functioned in the past to how it will aid students in Rural Studio’s future. If you would like to accompany us on that journey, check back in with our future blogs!