The Start of the Home Stretch

Welcome back to the 18×18 House blog, summer edition!

Meagan and Julie with Detyrick

Temperatures have officially risen in Hale County, and the 18×18 House team has had several milestones in the past month. Drywall was installed, trees were planted, siding is going up, paint is on the walls…

First, at the start of the summer, the team had to say “See you later” to Naomi, who traveled back home to South Africa. But this isn’t goodbye! We hope to see her back before the project opening.

18x18 Team

Digging the Groundwork

Then Jake, Julie, and Meagan got going on planting trees around the house, which was more work than you might think! They needed holes much larger and deeper than their containers, and plenty of water to protect them from the summer heat. Thanks for the beautiful trees goes to Plantation Tree Company near Selma, who donated all four!

And some shenanigans were involved, as usual.

Jake watering tree

We also had a visitor this month! Thanks to Jake’s sister Ella, we were able to set and cover the French drains on site, to help control water flow around the house. French drain systems include perforated pipes that are buried with gravel, to keep water from pooling around the property. Ours will funnel water away from the eaves of the house and from the porch. And after we put her to work shoveling gravel in the summer heat, Ella will never come to see us again.

Siding! And a porch!

We also wrapped all four sides in battens and purlins, to which the siding will be attached. The strips of wood are going to hold the upper portions of our siding a couple inches out from the house, to make a shadow line and hide refrigerant lines from the air conditioning system. The eastern façade is the first one completed, and isn’t it satisfying?

Soon, the steel porch roof will be installed, which was fabricated for the team by Superior Metal Works in Newbern, and delivered to site. It’s a big part of the exterior of the house, so we were eagerly awaiting its delivery!

DRYWALL!!!!

Amongst all the work outside, the most exciting part of the month was the drywall installation! There’s a huge difference inside the house now, and we’re so happy to see how light fills the spaces. Painting started right away so that interior finish work can begin soon. That means taping a LOT of corners and using very long extension rollers to get to that double-height ceiling.

The light in the house with drywall installed is better and brighter than we could have hoped. How ’bout them windows?

The summer is passing in a whirlwind at the 18×18 House, and the opening is in sight! We’re going full speed ahead with finishes, inside and outside. Stay tuned to see the end of our story!

Week 77: A General Update

Students working outside on Morrisette Campus

Live from Newbern, Alabama, it’s the Thermal Mass and Buoyancy Ventilation Research Project Team! 77 weeks in Hale County and the graduate student team is still firing on all cylinders. This post, they’ve got updates on concrete panels, drainage, and the steel walkway and stair. Plus, the wonders of the Wood-Mizer, a portable sawmill, for those readers who make it to the very end!

Panel Pour Product

Section Isometric: a peak at the interior concrete panels

A couple of weeks back the TMBV team poured four, new concrete panels. These panels were designed to test tongue and groove joining system. Also, this round of test concrete panels experimented with vertical formwork.

As predicted during the struggle of formwork construction and concrete pouring, the vertically poured panels did not turn out so well. However, the team made promising headway with the new joining method. Alright, now that the panels have cured, let’s take a look at the material.

First, you’ve got to remove the panels from the formwork. You know from the team’s previous post that one of the vertically poured panels did not make it all the way through pouring. Look at that; live edge concrete!

However, the smaller vertically poured panel survived! The results were surprising, as seen above this panel had more air gaps than the traditionally poured panel. The students previously thought having formwork on all sides would create more even and consistent panels. But, without an open surface to trowel, the vertically poured panels were subject to more air bubbles.

The typical, horizontally poured panels turned out smooth and even as ever. And just look at that grooved edge!

Diagram showing the corresponding concrete panel surfaces and joints

Next, the concrete panels were attached to the Fabrication Pavilion pin-up wall to test the joints. The results were inconclusive. Some tongue and groove joints turned out well, while others broke at the edges of the panel. Going forward, the team wants to attempt a shiplap joint for the panels. Also, they’d like to make more, smaller test panels to assemble in a miniature wall configuration.

Drainage Days

As you can imagine, in the everchanging weather of late, the Test Building site became the town swimming pool. The 18″ deep hole containing the foundations was nearly filled to the brim during the past weeks’ rain. Luckily, the team, Mason, and a mini excavator got out while the sun was shining to install the drainage. The French drain leads from the Cooling Porch, betwixt the foundations, into the forest line.

Rain between two foundations leading to woods

Walk this way

You might have been wondering how one day you might access the 30′ tall, 8′ above ground Test Buildings. Well, you’ll use the steel ships ladder and walkway of course.

Enscape rendering of Test buildings

As of late, the TMBV team students have been designing the fabrication and installation process of the stair and walkway. To detail the stair fabrication process, they partook in a classic rural studio technique; the cartoon storyboard.

cartoon showing assembly of steel stair

Next, the team planned out the order of installation of the walkway and the SIPs structural floors. First, they plan to place and secure one assembled SIPs Test Building floor. Second, place the other Test Building floor, using the walkway steel angle frame to square the two to one another. When everything is properly adjusted, lag screw the steel angle frame to the SIPs floors. Third, place 1″ metal grate on top. Next, place and bolt the stair to the walkway and ground connection. Lastly, site weld the handrails to the exterior face of the steel angle frame. Voila! It’s that easy if you only have a crane!

Wood-Mizer Wonder

And the special bonus; a portable sawmill! Adam Maggard, an Auburn University Forestry and Wildlife professor and Extension Specialist in Forest Systems Management, travels the southeast with the Wood Mizer portable sawmill conducting forestry management research and reaching out to family, forest land owners. Adam collaborates with Auburn Architecture Professor and TMBV colleague David Kennedy and Rural Studio Alum Will McGarity. The three gave the students a Wood-Mizer tutorial as well as an introduction to their research.

Rev. Walker’s Home Project team requested the visitors to help mill some gorgeous tree’s from Rev. Walker’s land. Each student took a turn milling down either the cedar or pecan tree. The students were amazed by the machine and even more amazed that freshly cut cedar is bright, pink. It was a remarkable experience, big thanks to Adam, David, and Rev. Walker from the Thermal Mass and Buoyancy Ventilation Research Project Team!