In preparation for putting up the wall plates, for the walkway, the Horseshoe Courtyard team set up scaffolding on-site, and ground off the old threaded rods on the East facade. These rods used to be part of the structure of the historic balconies, back in the late 1800s.

Testing jig, and ease of temporary attachment to the wall with Tapcons and washers. Initial leveling of tabs done with string attached to the 2×4.



The team also took a day trip back to the shop to cut the 5/8 inch threaded rods that will be used to fasten the walkway pieces, as well as the footing plates to the concrete. And the 1/2 inch rods that will connect the screens to each other.