A Lesson on Multitasking

Multitasking: A word that is taking on a very real meaning for the group of four on the Dining House Team! As the construction for the Dining House is officially off the ground, we’re busy bees, juggling three huge jobs: on-site construction, work on the mock-up, and design tasks! Here are a few of our recent highlights from the large Dining House to-do list!

Progress During “Neckdown” Week

During Neckdown of Spring 2026, when we the Diners made some headway by organizing the Studio’s lumber inventory in barns around Newbern. In January, we completed milling all 28 4″ x 6″ pine timbers from on-site trees. These structural members will be used in the final design as tension columns. The largest pine tree available to the Studio was milled down to six 2″ x 18″s, which will be assembled into a ridge beam composite for the Dining House.

On site, the team erected batter boards and mapped out the foundation trenches. We also provided guidance as a team of contractors rerouted major drainage lines, installed French drains, and ensured proper site water mitigation.

Once the footer was dug and underground utilities were prepared, the team went into action, preparing for the first concrete pour of the project. Over the span of a week and a half, the four of us divided and conquered in building rebar cages that were composed of eight sections, intending to support the concrete block wall and piers for the soon-to-come columns.

Leading up to the pour, we team worked hard preparing the wastewater line and readying the rebar for lowering into the trench. This process looked like unusually hot spring days spent shoveling, unloading, and tamping gravel into the footer.

Moment of truth! Final touches included placing rebar cages, grade pins, and supports into the trench and gathering helpers and tools for the big pour! On the Friday morning of the pour, we were full of nerves and of excitement to get some concrete in the ground. Within an hour, the task was done and there was no going back!

Natural lighting options for the Dining House

Feeling great with a major item checked off the do-to list, the team worked through design and construction details, mainly addressing lighting strategies. An investigation into skylights led us down a path to explore daylighting strategies—gable roofs with and without skylights!

Using a series of skylight options, we explored how specific task lighting would move through the room, from sunrise to sunset, at different times of the year.

The study helped us to uncover the specific function of light in the process. Thomas Patterson, our knowledgeable lighting consultant, listened to us present the many ideas we developed, our presentations aided by models, digital renderings, and 2-D drawings. We discussed overall goals of ambient light, specific task lighting for cooking, and how materials would be highlighted, landing on a design without specific skylight moments. Our design includes a typical gable, large eastern and western curtain walls, and French doors. We are excited about the amount of glowing and indirect light that these choices will allow into the Dining House.

Interior view of the Dining House kitchen with simple pendant lighting and lots of natural light from the east and west
Interior view of the Dining House kitchen with simple pendant lighting and lots of natural light from the east and west

Ditching the Groundwork and Going Modular!

Hello and welcome back to the latest edition of the Rural Studio Bathhouse blog! It has been a very productive couple of months, and we are thrilled to share an update of what is going on down at the Bathhouse.

Students pose with thumbs up on stacks of wood

As of our last post, we had just finished up with the concrete for the slabs and curbs and were preparing to pour the foundations for the water filling station and the gray water filtration system at the outdoor shower.

We finished up the rebar and got to pour both foundations, and we are now awaiting the final CMU blocks for both to be laid!

Off site, we continued making the rest of the outdoor shower wood modules for the walls. To drill holes through the modules for the threaded rods to go through, we built a jig with metal drill sleeves.

Once we got all the modules done, we designed and built “Abigail,” our alignment bracing interior jig, to align and justify all the interior faces of the walls. As we were finishing up with the outdoor shower, we were thrilled to receive the rest of the wood for the toilet and shower pods! We moved Abigail and the outdoor shower modules underneath the Supershed to make some space for the new wood.

Before we knew it, summer flew right on by, and we were preparing for the new semester. While very scary, it also meant that another week of “Neckdown” Week was upon us! This year, we were lucky to be working on site all week with an excellent group of helpers each day. Our goal for the week was to be finished with most of the remaining groundwork and the site rainwater infiltration trench. We had teams digging trenches for electrical and plumbing lines, chiseling concrete from the slabs and CMU blocks, taking apart our formwork from the slab concrete pour, and organizing and restacking bundles of our new wood.

Our good friend Tyler from C & T Excavating came back out during the week and spent a day digging the water infiltration trench and then filling it with gravel. This infiltration system is basically a large French drain that will collect the water runoff from the roof and most of our adjacent site. This water will move through the trench and filter into the ground slowly, preventing erosion and buildup of water around our foundations.

The next day, Tyler came back to dig a trench for the main sewer line to the septic tank, placed the PVC pipe, and then refilled the trench. He also spent a good deal of time mounding dirt around the foundations of the building to help direct site water away from the structures.

While all of this was happening, the team restacked the outdoor shower precisely by using Abigail under the Supershed. This allowed us to level each layer and move modules around as needed to ensure the best fit.

Very soon we will begin the process of manufacturing the roof and all metal pieces. Once we have the roof structure ready to go on site, we will begin the process of restacking the outdoor shower on site!

To prepare for the final stacking on site, we have also added the metal termite shield to the curbs of the outdoor shower.

student drills holes into termite shield
Adding termite shield and drilling holes for threaded rods

More recently, the team has been very excited to begin creating the modules for the toilet and shower pods! After stacking the outdoor shower, the team decided to have the wood for these pods planed on two sides, making the process of stacking the boards much easier. It has also made the modules much more level and even to each other.

We have also made the process of drilling the holes into the modules much easier by drilling the holes into one board at a time instead of through the whole module. This has led to many less broken drill bits so far. We are also very happy with how the new modules are turning out so far!

student drills through board
Improved drilling process

As we speak, we are continuing to make modules, finishing the rest of the groundwork (water lines and connecting to electrical service), and finalizing our drawing set in preparation for the building of our roof and walkway structure. The team is also diving headfirst into the details of the design of the interior finishes and fixtures.

We are so excited with how everything is turning out and can’t wait to see these spaces come to life!

student poses with cutout cardboard heart

While we are happy with the progress being made, we are super excited for the next phases of the project and cannot wait to begin the process of learning how to weld and work with metal in the shop.

students jump on stacks of wood.

Thank you so much for reading along and keeping up to date with all things Bathhouse. We look forward to the next time we can provide a super exciting update!

– Rural Studio Bathhouse Team