Next Time You See Me, It’ll Be On Site

Since our last update, the team has been digging, chopping, drilling, and sawing our way through the project, so let’s catch up!

First up, mock-ups. To better understand the details of the project in three dimensions, the team jumped into a 1:1 mock-up of crucial project details and so far, we’re learning a lot. More than just dusting off our chop saw skills, building several details at full scale is a way for us to reflect and improve upon some of the decisions we made on paper. For example, we learned from testing the window framing that making the rough opening stud continuous not only creates fewer pieces, but allows a direct load path from header to foundation. We’re also testing the character of the porch assembly and how we can marry our desired aesthetic with required bracing for wind uplift.

To prepare to break ground, we called in a local contractor to do some serious tree removal that was beyond our capabilities, and simultaneously ripped up the existing chain link fence to create equipment access and give us a chance to fully assess its condition and salvageability. The site has never looked spiffier.

site before clearing
cleared site

And how could we not give a toast to Pig Roast?! The first ever two-day Pig Roast went swimmingly, minus the part where our team ran into a rain shower and came out looking like we’d gone for a swim. It was the first time many members of the Uniontown community were able to see the project, along with our parents, friends, and many Rural Studio alumni.

team at pig roast
pig roast fireworks

The following week stayed just as busy as teams prepped for our second Executive Review. This was a make or break moment for the future of the project, but after an intense two-hour review, all three teams were given the green light! This means it’s full steam ahead for construction.

team meets for stress test

Oh yeah, and all twelve 5th-years graduated college three days later! What a week! Diplomas might be in the mail, but things are just getting started in West Alabama. The team is taking a few days off to relax and be with family, but y’all better believe the next time you see us, it’ll be on site!

Also, a big thank you to our parents for letting us stick around West Alabama for this next phase: building the C.H.O.I.C.E. House. And to our 3rd-year friends returning to campus this fall, we’ll see you next time in Hale!

Don’t Be Stair-tled By A Review

Hey, Hi, Hello, and welcome back to the Patriece’s Home blog! Since the last blog post, the team has been busy preparing drawings for the 5th-years Executive Review (informally know as “stress test”) with Justin Miller, Associate Professor and new Head of Auburn’s School of Architecture, Planning and Landscape Architecture, and Rusty Smith, Associate Director of Rural Studio. The annual stress test examines each project’s potential and feasibility to continue into the summer.

In preparation, the latest designs were drawn with a greater degree of detail. (No more pochéd walls, folks!) And with the site now surveyed, the team began studying the position of the house in the surrounding landscape, focusing on forming comfortable, shaded exterior rooms.

The reviewers challenged the team to examine and test the design’s passive heating and cooling systems. The team was also asked to address potential foundation challenges; with a eaveless house design, water may collect at the base of the wall and undermine the strength of the building’s ground connection.

After a unanimous thumbs-up from their reviewers, Patriece’s Home team has moved forward drawing plumbing, electrical, and lighting plans. They hope to soon order their manufactured attic trusses. The 6’ space the doubled-up trusses straddling the stairs created has facilitated a double-height celebratory space. To highlight and delight in the space, the team has also decided to clad it with a hardier, more durable wood material. 

The team ended the intense week of preparation and reviews with a model-stand building workshop with a group of visiting 1st-year Auburn architecture students. Everyone enjoyed getting out of Red Barn, working with fellow architecture students, and reminiscing about the old days at Dudley Hall.

Andrew Freear gives a lecture to the first years under the Great Hall at the Morrissette campus.

The team still has lots more to do! They are now drawing their most difficult details and combining them into a plan for a 1:1 mock up. They will also begin soil testing and prepare the site to build the home’s foundation! Onward and upward! Check back in a couple weeks to see how far the team gets on their 1:1 mock-up!

If You Can’t Take the Heat, Get Out of the Pavilion!

Howdy from the Moundville Pavilion team! The design has continued to evolve quickly throughout the past couple of weeks as they have been heavily focused on constructability and modifying the design of the columns. The team also got the chance recently to participate in Moundville Archaeological Park’s Knap-In, an annual stone tool makers event where visitors can learn about flint tools and how they’re made.

Columns and Ceiling

After the team clarified the design concept, new iterations of columns began to emerge that focused strongly on the overall intent of the project and its place within the site. The team looked at the columns in elevation, large-scale models, and renderings. 

An axon drawing of a column
Column plan and elevation
Connection between column and truss

In conjunction with the column design, the team has also been exploring ways to give tolerance to the ceiling assembly along with the method of attaching the finished surface material to the underside of the trusses. With the decision to deconstruct the current partially built pavilion, the team has the opportunity to realign the upper or lower ridges and two of the four planes that make up the form. Aligning the upper ridge allows for smoother and faster assembly of the direct-bearing roof structure and gives shelter during the construction of the ceiling. The team also decided to add lumber to the bottom cords of the trusses to align the two lower planes. The overall goal is to allow for the most efficiency and tolerance when reconstructing the trusses.

A drawing explaining the intersection of roof, ceiling, and a truss
A drawing looking at the details of the ceiling panels

Reviewing Executively

All of this work and response to recent guest reviewers culminated in an Executive Review, the event formerly dubbed “stress test.” The annual stress test examines each projects potential and feasibility to continue into the summer. Justin Miller (Head of the School of Architecture, Planning and Landscape Architecture), Rusty Smith (Rural Studio Associate Director), and Emily McGlohn (Rural Studio Associate Professor and leader of the 3rd-year studio) met with the team to see where the project currently is and where it is heading. 

The team presented their work at the Executive Review.

Rusty and Justin encouraged the team to consider an overlapping clip system for their ceiling and to see how we could simplify the design of the column to find a stronger balance between functionality and concept. At the end of the review, the team was challenged to build a full-scale mock-up of the final column design, complete with the roof structure, to show at the annual Pig Roast celebration at the end of the semester. 

Keep on Pushing!

In response to the feedback, the team is continuing to explore the column design, testing the suggested ceiling construction method, and mocking-up how the structure will be assembled. 

Check back soon to see where we head next as we begin to prepare for Pig Roast!