As Summer winds down, the C.H.O.I.C.E. House team is heading into Fall with a shiny new slab, but how’d we get here?

finished slab pour

Picking up from our last post, we trenched for plumbing and put a pipe puzzle together, making sure that all of our pieces were properly placed before pouring concrete. A big thank you to this week’s guest stars on site, our friends Elisia and Caitlyn.

In the past couple of weeks, twenty new faces arrived in Newbern signaling the start of a brand new academic year. With the new year comes “Neckdowns,” and our team was lucky enough to have a whole crew of helpers throughout the week. Continuing with our prep for “The Big Pour,” our new 3rd and 5th-year friends showed up to place rebar and grout our CMU cells to further strengthen the foundation.

After the pipes were buried, we brought in gravel as the next ingredient in our slab sandwich.

Vapor barrier and mesh then followed, as well as formwork for the showers. Because the shower needs to slope to drain water, we built formwork that will allow us to do the showers as their own pour. The maintenance closet also gets its own pour, so we prepped for that too.

Once we got everything placed, plumbed, and tied, we were ready for the main event: “The Big Pour.” Once again, thanks to the crew from Crosby Carmichael for the concrete. With the help of our concrete finishers, we got the whole pour done in a morning, and we were able to use the extra concrete to set anchor bolts for the porch.

Who knows what these next few weeks hold? We do, actually.

Our trusses are ready for delivery, and by the time this is posted, our lumber package will be on site. We’re also taking some time in studio to explore new details for the windows and the porch, so we’ve got plenty to nail down before our next post, literally and metaphorically. 