It has been an exciting time in Hale County for the First Congregational Church Hall team! Here’s where we are right now: We’ve moved forward substantially, driven by our progress on the tongue-and-groove Timber Insulation Pod and insights from engineer Joe Burns and architects Cheryl Noel and Ravi Ricker of Wrap Architecture. We’ve designed the superstructure, adding a ridge beam, and confirmed our compliance with codes. Then we refined the design for the foundation and prepped the site. Now we’re marking out the foundation’s footings and preparing to break ground!
So, how did we get here? Let’s step back to Pig Roast in the spring. Our first “must do” was testing and constructing the structure of the tongue-and-groove Timber Insulation Pod, because the Pod represents how the Church Hall structure will eventually appear. Alongside this progress, we constructed a to-scale frame of the Church Hall’s north wall to represent the size and feel of the building, something visitors would see at a later stop on the Pig Roast tour. To top it all off, we drew new iterations of exterior perspectives, interior perspectives, and plans and sections of both the buildings and the site to really test the version of the design we presented at Pig Roast.




Finally, the day of the event arrived. We presented our First Congregational Church Hall work in the church itself thanks to help from, and coordination with, the congregation. After the presentation, everyone walked outside to view the string projection of the courtyard’s layout and the inclined walking path and to see how these combined with the building footprint. It was an incredible opportunity to present our latest work to so many new people.



Once the Pig Roast festivities concluded, we trekked back to Auburn, AL, for the Auburn University Spring 2026 Commencement (Graduation) ceremony. The four of us on the First Congregational Church Hall team, as well as those on the Deborah’s Home team, have officially graduated. Those B. Arch degrees didn’t earn themselves!


Returning from graduation, we hit the ground running on the construction of the Timber Insulation Pod. We finished building the floor, which included insulation and electrical wiring. Then the tongue and groove decking went up on the roof, walls, and floor. Right after that, we framed and sheathed the gable-end walls. After we had our walls and roof, it was time to install openings and begin insulating.












While work on the Pod continued throughout the summer and into the fall, so did the design progress on the Church Hall. Structural engineer Joe Burns helped us finalize the primary structure with the addition of a glue-laminated ridge beam. We always check that our designs comply with the International Building Code, but the extra eyes of professionals make us confident: We’re grateful to architects Cheryl Noel and Ravi Ricker of Wrap Architecture for verifying that we aren’t missing any major details. During the design of the superstructure, we kept pushing forward on drawings for the foundation. Now that the trees on-site have been cut down, we are currently marking out the foundation footings, and we’re preparing to break ground very soon!


That’s all for now from the First Congregational Church Hall. Up next will be further progress on the Timber Insulation Pods and updates on breaking ground for the Church Hall!