Author: McAllister Tucker

Ready to Break Ground

It has been an exciting time in Hale County for the First Congregational Church Hall team! Here’s where we are right now: We’ve moved forward substantially, driven by our progress on the tongue-and-groove Timber Insulation Pod and insights from engineer Joe Burns and architects Cheryl Noel and Ravi Ricker of Wrap Architecture. We’ve designed the superstructure, adding a ridge beam, and confirmed our compliance with codes. Then we refined the design for the foundation and prepped the site. Now we’re marking out the foundation’s footings and preparing to break ground! 

So, how did we get here? Let’s step back to Pig Roast in the spring. Our first “must do” was testing and constructing the structure of the tongue-and-groove Timber Insulation Pod, because the Pod represents how the Church Hall structure will eventually appear. Alongside this progress, we constructed a to-scale frame of the Church Hall’s north wall to represent the size and feel of the building, something visitors would see at a later stop on the Pig Roast tour. To top it all off, we drew new iterations of exterior perspectives, interior perspectives, and plans and sections of both the buildings and the site to really test the version of the design we presented at Pig Roast. 

Finally, the day of the event arrived. We presented our First Congregational Church Hall work in the church itself thanks to help from, and coordination with, the congregation. After the presentation, everyone walked outside to view the string projection of the courtyard’s layout and the inclined walking path and to see how these combined with the building footprint. It was an incredible opportunity to present our latest work to so many new people. 

Once the Pig Roast festivities concluded, we trekked back to Auburn, AL, for the Auburn University Spring 2026 Commencement (Graduation) ceremony. The four of us on the First Congregational Church Hall team, as well as those on the Deborah’s Home team, have officially graduated. Those B. Arch degrees didn’t earn themselves! 

Returning from graduation, we hit the ground running on the construction of the Timber Insulation Pod. We finished building the floor, which included insulation and electrical wiring. Then the tongue and groove decking went up on the roof, walls, and floor. Right after that, we framed and sheathed the gable-end walls. After we had our walls and roof, it was time to install openings and begin insulating.  

While work on the Pod continued throughout the summer and into the fall, so did the design progress on the Church Hall. Structural engineer Joe Burns helped us finalize the primary structure with the addition of a glue-laminated ridge beam. We always check that our designs comply with the International Building Code, but the extra eyes of professionals make us confident: We’re grateful to architects Cheryl Noel and Ravi Ricker of Wrap Architecture for verifying that we aren’t missing any major details. During the design of the superstructure, we kept pushing forward on drawings for the foundation. Now that the trees on-site have been cut down, we are currently marking out the foundation footings, and we’re preparing to break ground very soon! 

That’s all for now from the First Congregational Church Hall. Up next will be further progress on the Timber Insulation Pods and updates on breaking ground for the Church Hall! 

What’s a studio without its students?

Welcome to the Students of Rural Studio blog! We are the first student organization here on Rural Studio’s campus, and it has been one busy year.

First, what is “Students of Rural Studio?” 

Students of Rural Studio is a student-led organization dedicated to supporting and advancing the mission of Auburn University Rural Studio. We work to bolster both the community around us in Hale County and our community as a student body.

Our members and leaders took on the challenge of understanding how a student organization could accomplish these goals. Our 28 members currently are led by President Aynsley Norris, Vice President Amanda Kaase, and Treasurer McAllister Tucker, along with Organization Advisor Natalie Butts-Ball.

This past year we have had three Community Days, Saturdays that students both at Rural Studio and from main campus dedicated to community engagement extending beyond their own projects.

Students pose on playground equipment at the Newbern Playground.

Our first Community Day was a large cleanup of the Newbern Playground, a park built by Rural Studio in 2001 just a few minutes north of campus. We had an amazing turnout, with 25 students—11 from main campus, six 3rd-years, and eight 5th-years—all coming together to paint, clean, and rebuild a community resource in Newbern.

Our second Community Day was in November, in the middle of the government shutdown that halted many resources people in our area rely on. We worked with Amanda Pinkstaff, our amazing campus chef, to prepare Thanksgiving casseroles for families in Newbern. Mayor Patrick Braxton helped us by spreading the word, and we made and distributed nearly 50 casseroles. We also ran a food drive and collected produce from Rural Studio Farm to distribute to 30 families served by C.H.O.I.C.E. in Uniontown. We extended the theme of our previous Community Day by cleaning up a small community park in Uniontown near neighborhood near C.H.O.I.C.E.  

Four students with shovels finish planting a Crepe Myrtle tree at Smith Park in Greensboro, Alabama.

For our final Community Day of the year, we spent a Saturday helping the Smith Park team plant trees before the planting season ended. Their team had planted 73 trees so far, and as a group of nine volunteers, we were able to plant 10 in a single morning. 

We also hosted events for students and faculty. Once a month, we had “Frankie Fridays,” when we grilled out at Morrisette Campus. We also had “Coffee Shop” during several of our wonderful lectures throughout the year, and we showed off the students’ impeccable barista skills at Pig Roast, making all sorts of specialty coffees and teas.

The final event of the year that Students of Rural Studio hosted was our Field Day. Third-years, 5th-years, and “leftovers” (graduates staying to complete projects) competed in all the classic field day games: capture the flag, dodgeball, relay racing, and so much more. Although the victor was unclear (except in the case of Aynsley and Lenny’s remarkable performance in the three-legged race), it was a spectacular finale to our first year.

Thank you to every community member, member of faculty and staff, and students who participated and supported us. It was a phenomenal year, and we are so excited to keep checking in as Students of Rural Studio continues to evolve! 

Getting Into the Weeds

The First Congregational Church Hall team has been hard at work!

We had an insightful meeting with Andrew Berman, Founder of Andrew Berman Architect. He guided us to critique and define the look of the hall from the outside, as well as to refine a universal point of entry into the First Congregational Church’s front door. With Andrew’s comments in mind, we marched forward with a clear organizational strategy for the look and layout of the building. 

The following week, we met with Mike Newman, Architect and Co-founder of SHED Studio in Chicago, Pete Landon, founder and Principal Architect of LBBA, and Katrina Van Valkenburgh, Managing Director of Corporation for Supportive Housing, Central Region, in Chicago. Mike, Pete, and Katrina further guided the organization of the interior of the church hall with further suggestions of adequate materiality. 

We had the opportunity to show the First Congregational Church Hall design to all the members of the LOEB Fellowship from Harvard University! The LOEB Fellows gave useful advice on the presentation of the project. Later that same week, we met with much of the congregation for the first time. Updated interior and courtyard perspectives highlighted the big moments of the project. The congregation shared insights on both building layout and universal-access connection between the First Congregational Church and the new Church Hall. 

The First Congregational Church Hall Team poses for a photo with their clients.

After meeting with the congregation, we checked in with landscape architect Mary Margaret Jones with Hargreaves Jones. Mary gave her advice on the new schemes and on viable plants for both the courtyard and surrounding site. Then, we got into the dirt and talked about site grading and watershed. 

The First Congregational Church Hall team had our first executive review of the semester. We received feedback from Rural Studio faculty and teaching staff, of course, but also from Rusty Smith, Associate Director of Rural Studio and lead of the Front Porch Initiative, and Justin Miller, Head of Auburn University CADC’s School of Architecture, Planning and Landscape. We showcased the design and received valuable feedback on key building details and eventual construction sequencing. 

After Spring Break, we were able to meet once more with Amanda Loper, Principal Architect with David Baker Architects. Amanda shared her thoughts on honing the plan layout as well as on refining the universal access route to the front door of the church. Amanda also gave incredible guidance on drawing inspiration from local environments and conditions for source materials. 

Since Amanda’s visit, we have been working on a new site survey of the church grounds. This refined survey will allow us to make more precise earthwork calculations and inform decisions on foundation details. So, back to the drawing board we go! 

The First Congregational Church Hall Team's faces superimposed onto four cartoon flowers.

See you next time! Happy Spring!

Plenty of Congregating

The First Congregational Church Hall Blog is back! Let us catch you up to speed on our progress. 

After a restful winter break, we hit the ground running and consulted Mary Margaret Jones with Hargreaves Jones for advice on landscape designs iterated before the new year. Mary Margaret provided valuable insight into the expected circulation of visitors and their interaction with the proposed courtyard schemes. After the meeting, we reanalyzed the role a courtyard plays in connecting the two buildings! 

Three fifth year students work at their desks in studio.

After “Neckdown” Week, our team worked hard to produce renderings of key perspectives throughout the project. Perspectives included an approach to the new building from the door of the church, as well as an approach from the current parking lot. We created renderings for the two main schemes at play: a parallel oriented building and a perpendicularly oriented building. We showcased these views in a critical meeting with the client. Our client’s insights gave us much-needed direction. After the meeting, we decided to continue only with the parallel orientation. 

A pin-up of perspective courtyard drawings and building sections.

Kiel Moe, Professor of Practice of Architecture at Auburn University and practicing architect, stopped in to see the progression of the Timber Insulation Pods, two new student housing pods at Morrisette House. During his time in Hale County, he provided valuable critique of the First Congregational Church Hall. Each team member produced color pencil–rendered elevation drawings to develop ideas for the building cladding. 

As we were digging more thoroughly into the design of the building, we found ourselves at a good place for review with Hank Koning and Julie Eizenberg, both founding partners and principal architects of Koning Eizenberg Architecture. They ran a workshop where they helped us reimagine what was possible with the interior of the First Congregational Church Hall itself. Hank and Julie have taught us to pair our future design iterations against the scenarios of events and circumstances that are important to the congregation! 

That’s all from the team this time, we can’t wait to see you in the next blog!

The members of the First Congregational Church Hall Team are photoshopped onto a image of the Penguins of Madagascar.

How Do You Even Roast Soup?

Welcome back to the First Congregational Church Hall Blog! We’re excited to show you all what we’ve been up to since Halloween Reviews.

Two students marking up site plan drawings with a scaled model beside them.

After drawing up plans and sections of three Church Hall building orientations, we decided it was time to get on site and stake out building footprints. We did this with twelve wooden stakes and three different colors of string, using a sledgehammer to drive the stakes into the ground. Our team drilled screws into the stakes at the same level as the sidewalk that leads to the First Congregational Church. Finally, we did the easy part: tying the string to the screws! Visualizing building footprints relative to the standing First Congregational Church informed our perception of building scale and appropriate proximity to the existing church.

We had the good fortune to receive feedback from consultants Frank Harmon, principal architect of Frank Harmon Architect, Philip Szostak, principal architect of Szostak Design, and Dan Wheeler, principal architect of Wheeler Kearns Architects. We were honored to show them not only how the First Congregational Church Hall design is shaping up but also what the First Congregational Church of Marion looks like in person. On site, we used the site model to discuss how narrative can inform processions through the site.  

Additionally, Frank Harmon and Dan Wheeler led a studio-wide drawing workshop in which students were encouraged to interpret the architecture of downtown Greensboro through quick five-minute sketches. 

Three students stand next to an orientation mock-up at the site of the First Congregational Church of Marion.

Curious about the progress on the Timber Insulation Pods? The lap splice cuts have been made! We measured the overlapping moments of force on the bents (transverse rigid frames) and columns and conducted a series of cross-cuts against the grain. After a section was fully cross-cut, we used chisels and mallets to clear and smooth ridges. Now, the bents and columns are ready to be assembled! These glue-laminated timber columns and bents serve as a working mock-up for the structural strategy for the First Congregational Church Hall. 

After a restful Thanksgiving, we hunkered down and refined design iterations for Soup Roast! To better illustrate the approach to the building and the materials, we photo rendered hand-drawn perspectives. These renders proved instrumental in describing both the feel of the space and our attitude toward the Church Hall’s interior and exterior. 

The highlight of the semester was presenting this project to an incredible lineup of reviewers for Soup Roast: Kim Clements and Joe Schneider, founders of JAS Design Build; Jake LaBarre, Associate with The Miller Hull Partnership; Joe Burns, structural engineer and Managing Principal with Thornton Tomasetti, as well as structural engineer for the Studio; Jim Adamson, Partner with Jersey Devil design build; and Sandy Bishop, first Executive Director of Lopez Community Land Trust. These professionals each shared insights and observations on how the schematics for the First Congregational Church Hall have progressed thus far. These reviewers all aided in a workshop the following day, collaborating to create new schemes building off the progress we’ve made so far. 

Concluding our 5th Year Studio Fall semester at Rural Studio, we are more excited and invigorated to continue designing the First Congregational Church Hall than ever before! Next semester will include a closer look at building and landscape details, as well as further study of how architecture can serve a congregation and community. We hope you all have a Happy Holiday season! 

The Church Hall team edited into an image of dancing elves with "Happy Holidays" written as a greeting.