Our spring 2021 3rd-year students finished off their time at Rural Studio with a bang! The last couple of months in Hale flew on by, taking nine students away with them.
History Class
As the semester wrapped up, so did the seminar with their professor, Dick Hudgens. Students toured a few more pre-civil-war homes and Dick held final reviews for the students’ work. Out on the Spencer House front porch, each member of the class presented three months’ worth of sketches from house tours, watercolor work, and historic housing “Design Problems.” Thanks to Ian Crawford for attending the review and providing his wise-as-ever advice and expertise!
Shop Class
Students worked diligently until the very last hour, oiling and installing cabinets. Plywood cabinets finished with tung oil and paste wax were designed and built this semester for the following spaces in Ophelia’s new home: the kitchen, nook, utility room, bathroom, and bedroom. That’s a lot of cabinets! Nineteen, to be exact.

Yes, they also built a house!
During the past few months, a lot happened at Ophelia’s Home. The remaining pieces of ZIP System sheathing were nailed into place by the Enclosures Team; Ashley, Juyeon, and Logan. Then windows, doors, and joints were meticulously taped.
After Ophelia chose a siding color—burgundy—the team got to work installing the corrugated metal cladding. By the end of the semester, these three students of the Enclosures Team were mastered cutting and installing metal panels.

Remember those funky exterior design charrettes? The ones considering tricks-of-the-eye and optical illusions? Well, those design discussions came to fruition during siding installation. The metal corrugation runs in two directions, which helps enhance a new proportion on the front faces while disrupting the front corner of the house.

The MEP (Mechanical, Electrical, and Plumbing) Team—James, Kirby, and Wendy—spent their days putting together the many parts and pieces that give a house running water and power. These three students installed the entire MEP system for Ophelia’s Home from scratch! Because there’s so much that goes into these systems, they spent a whole lot of time driving to Lowe’s and back… and to Lowe’s and back again.

While MEP and Enclosures Teams were working away, the Interiors/Rough Framing Team–Austin, Drew Haley, and Sadie–was steadily constructing the back stoop and front entrance to the house. They also put the finishing touches on the inside of the house. First, they tackled the back stoop: digging holes for three posts, constructing a platform, decking the platform, and building the stairs.

The team then moved inside and recruited help from members of the MEP Team to paint the walls and ceiling and install laminate flooring.

For Ophelia’s front entrance, this team built the formwork for and poured the concrete ramp! Many thanks are due to Andrew and Steve for helping with the ramp’s design and construction.

Pig Roast
The semester concluded with an “in-house” celebration of the Studio and the incredible body of work accomplished this year. We’ll miss these students dearly, and hope they return to Hale again soon (5th-year, perhaps?). Once a part of Rural Studio, always a part of Rural Studio.