Fall Means Walls

One month since we last posted, and our site is practically unrecognizable! It’s been a productive few weeks out in Uniontown, so let’s catch up.

sheathed units

South Street’s newest slab was just itching for some walls, so we started by installing pressure-treated sill plates. Using a powder actuated nail gun, we shot nails through the lumber and concrete, giving our walls a solid connection to the slab. 

sill plate installation

We then framed up all of the exterior walls, attaching them to the sill plates and bracing them back against the ground to keep everything plumb and level. 

After bracing the exterior, we turned our attention to the porch and ramp where there was yet more concrete to be poured. We built formwork for the column base, porch caps, and ramp edge. Over the next couple of days, we hand mixed and filled the formwork. Mixing the concrete ourselves allowed us to work at a slower, more careful pace and finish the pours to our satisfaction.

ramp edge without formwork

Then we were seeing green – green ZIPS panels that is. Thanks to the fine folks at Huber Engineered Woods, we started sheathing our walls to make them more rigid before raising the trusses.

ladder framed by window

And now we’re ready to raise the roof for real! Our trusses are on site and ready to be raised within the next few days. Until then, Auburn’s basketball team won’t be the only ones practicing their crane skills.

trusses being delivered
crane kick meme