Get MEPped

Spring has sprung on the 18×18 House site! And with the grass, flowers, and leaves on the trees, new things are springing up inside the house too…

After installing their Pella windows at the start of this semester, the team kept moving with mechanical, electrical, and plumbing rough-ins, or MEP for short. That means pipes and wires!

First up were the drain, waste, and ventilation pipes. The PVC had to be cut and sections fitted together, leveled to slope downwards everywhere, and then taken apart to be glued BACK together. It took some trial and error, but Julie was on top of it.

After drain pipes were glued and checked for leaks, the team moved on to water supply lines. These had to be run to the outside of the house, where eventually the main line will be connected to the water meter.

Student with water line

Inside the house, flexible pipes snake through the walls to a few places. They eventually reach the locations of everything that will use water: the bathroom sink, toilet, shower, kitchen sink, washing laundry, outdoor hose, and refrigerator. Some of the spaces were tight, but once again, Julie saved the day.

Then we ALSO checked all of those pipes for leaks, but this time using air pressure.

Student reading air pressure

Meanwhile, we were also filling the walls with wires to run electricity throughout the house. Wires need to run to every single outlet, switch, and fixture, which can get complicated in a compact space like the 18×18 House.

But fear not! Meagan kept track of all the circuits, which all worked when tested! Phew.

And if that weren’t enough to keep everyone busy, the team has been finalizing some new flashing details for the exterior of the house. The 18×18 House will have about two-thirds of its cladding bumped out by a couple inches to add some dimension to the metal siding. Jake’s on that one!

Look at him. We’re all so proud.

Student with flashing mock-ups

And the FINAL thing the team has done to date… interior finishes! As the insulation and drywall stages approach, the “18s” are deciding on flooring, stair materials, railings, you name it.

The spring evenings in Hale County are setting the 18×18 House aglow every day. Keep an eye out for more changes as spring turns to summer, and as the team gets closer to the finish line!