Over and Out

It’s curtain call on the Myers’ Home, construction that is. The team wrapped up just in time for the holiday season and towed away the trailer and all. The keys have been given to the clients. The team can’t wait to hear how the house functions in action. But how about a dive into those last few weeks on site in Newbern?

Flex Walls, Finally

One of the primary aims of the Myers’ Home was to provide a formwork for varying generation needs. The team explored this concept by building the “shell” house with no spatial divisions outside of the “core” volume. With this method, a client could hypothetically walk through the full-scale model of the home. With full experience of the space, they can decide where they’d like bedroom divisions from several schemes.

These “flex walls” are stud walls constructed in place, rather than tilt up, and anchored with a few masonry screws. They are paneled with sanded and primed plywood and fasteners are entirely visible. These details allow the walls to be more easily altered or removed years down the road. If the family is in need of a new room configuration, these walls can handle it.

Bits and Bobs

Of course, at the end of every building project there is what’s called a “punch list.” It’s a list of the remaining tasks to ready the house for turnover. On this list for the Myers’ Home was a few coats of finish to the butcher-block countertops, making the stair handrail, caulking the last of corners, tightening up door hardware, and sealing the interior and exterior slabs.

Porch Conclusions

Another final task was to complete the lower row of siding on the front exterior face of the home. A quick task that certainly visually completes the house quickly!

With all bents in place and secured, we begin raising and securing purlins. Then, we welded the purlin mats at the same time as the bents and installed them as single units by bay. Riley took the reins and began welding up a storm while the others clamp and shimmy the pieces to level.

Finally, we wrapped up the roofing, a quicker job than expected. After just a day and a half the team completed the final line of siding and the porch roof. The panels went on with slightly more precision than the main roof. The tapping screws needed to catch the 1-1/4″ purlins, so measuring and pre-drilling of the sheets and purlins were required.

With a final coat of sealant to the interior slab and porch pavers, the house was ready for move-in!

That’s a Wrap

Madeline, Judith, and Riley are on to new endeavors, though questionably bigger and better than this one.

Start spreadin’ the news! Riley is kicking it in the Big Apple, starting work at MADE Design/Build in Brooklyn, NY. With an in-house woodshop and IKEA next door he’s sure to be up to his ears in miters and meatballs.

Judith is sticking around Newbern and joining the teaching team as 3rd-Year Instructor/Coordinator. She’ll be working on Rosie’s Home with Emily McGlohn and the new batch of 3rd-year students. Hale County just can’t seem to shake her off!

Madeline has hit the road to Bozeman, MT, where she’ll be working at Minarik Architecture. She’s pleased with her new snowboarding opportunities and excited to get into conscious and contextual residential work. Stay thawed up there!

The team could not be more grateful for the support of Rural Studio faculty and staff, student colleagues, consultants, donors, and friends. It’s not goodbye, it’s see you later. This is the Myers’ Home team signing off.