The Thermal Mass and Buoyancy Ventilation Team’s days of pouring concrete and manning the man lift are over. All of the internal thermal mass concrete panels have been poured, cured, and installed in the Concrete Test Building. Another milestone hit is the completion of the exterior cladding (minus the Cooling Porch ceiling). The team waved goodbye to both the articulating man lift, generously donated to the project by Sunbelt Rentals, and to team member Livia. She journeyed to Austin, TX, to work for Rural Studio Alum Lucy Begg and Robert Gay at their firm, Thoughtbarn. Good luck Liv!
Let’s check out the progress!
Cladding Completion
The team met their goal of finishing all cladding which required the articulating man lift by the end of October. The bleach-stained cypress covers all exterior surfaces including the Chimneys. The team left one side of the cladding longer than necessary. Then they came back with a skill saw and a guide to give one clean cut. This ensured that all corner reveals were exactly 1/2 inch wide.
Interior Optimized
Over 70 1-1/8 inch concrete panels now line the walls of the Concrete Test Building. The team crafted formwork and processes for pouring, transporting, and installing each panel. Behind the panels is 1/2 inch rigid insulation which creates a thermal break from the OSB sheathing during the testing phase. For roughly the next year, the Test Buildings will be unoccupied as temperature and ventilation measurements are continuously recorded. Afterward, the Test Buildings will be prepared for either more experiments or occupation by 3rd-year students living on Morrisette Campus. Check out the nearly complete Concrete Test Building below! Only some buffing and shining to go!
Bonus!
Also in the works as of late is a vent cap for the bottom chimney opening within the Test Buildings. This cap seals the lower ventilation opening shut during winter occupation. Seen below is Rowe welding a frame for the hatch!
Don’t miss Jeff and Rowe’s wonderful Halloween Review costumes. Jeff as his prized Milwaulkee leaf blower and Rowe, a leaf, one of many victims. Keep checking back in as the Test Buildings near completion!
History professor Dick Hudgen’s TMBV Test Buildings Sketch!
Right now the Thermal Mass and Buoyancy Ventilation team is all about concrete and cypress. They’ve been busy creating and installing the shiplap jointed, 1-1/8″ thick concrete internal thermal mass panels. These panels line the walls of one of the Test Buildings and create the designed cooling and ventilation effects. With Jeff at the helm of formwork building, they’ve completed three out of four panel pouring phases. The panel-making process is separated into phases, so most of the formwork can be used more than once, eliminating waste. Formwork, or molds, are fabricated with precision in the woodshop. The team installed phase 1 before Cory began his journey to Nova Scotia to participate in a residency with McKay-Lions Sweetapple Architects Ltd. Congratulations Cory, we miss you already!
Also on the agenda as of late; exterior finishes! With weather-proofing complete, the team has taken to installing the cladding part of the ventilated cladding system. This system is completed with 8″ and 6″ cypress boards which are protected with Cabot® Bleaching Stain. The stain also helps the wood age consistently in the sun. With Livia cutting and Jeff and Rowe installing, the cypress siding is flying up!
Unseen are the myriad of other little things the team is finishing up such as electrical and grading. The team is keeping the momentum up so stay tuned to see the buildings fully wrapped!
Panel Production
Panel pouring process: Mix concrete, fill form, transfer to vibrating table, trowel, and finish!
Live from the Test Buildings, it’s the Thermal Mass and Buoyancy Ventilation Research Project team. After swiftly assembling the Test Buildings, the graduate team began weatherproofing. The team’s goal is to have the buildings protected from rain quickly so they can get to work on installing the thermal mass panels on the interior. The weatherproofing systems are designed to mitigate heat gain in different ways to eliminate experimental variation.
First, the team covered the buildings in shingled tar paper–a heavy-duty, waterproof construction paper. Next, the team installed battens which create space between the structure and cladding allowing for ventilation and avoiding heat gain. The roof is also ventilated and covered with highly reflective, low albedo corrugated sheet metal. This means the materiality and color of the roof are fighting solar radiation.
Lastly, the team installed the beautiful steel door frames. Turnipseed International donated the steel and Brad of Superior Metals LLC welded the frames Thanks for reading and stay tuned.
Tar Paper and Battens
Installing battens on the walls and underside with the help of Bess!
Roof Battens and Flashing
Roof battens
Flashing detail
Flashing complete
Roofing Metal
Installing corrugated sheet metal roofingBoth roofs complete!
Door Frame
The steel frame: from transportation to installation!
Live from inside the mock-up that spanned seasons, it’s the Thermal Mass and Buoyancy Ventilation Research Project team! You may remember the mention and drawings of a mock-up back in January. Many things interrupted steady work on this mock-up including breaking ground, pouring foundations, steel design, steel fabrication, writing papers, installing drainage, designing the cooling porch, and testing concrete panel joinery types. However, after all this time, the mock-up is complete! In the two weeks before Pig Roast and graduation from the master’s program, the TMBV student team not only hoisted the test building columns and submitted a paper detailing their experiments, they also completed two mock-ups. That’s right, two–we’ve got a bonus!
Faux SIPs and Small Columns
This mock-up set out to test the ventilated roofing and cladding system while also allowing practice for some of the atypical waterproofing details caused by the chimneys. All elements of the mock-up are at full scale, however, these elements are taken from different sections of the Test Buildings and condensed. Therefore the real Test Buildings are not proportionally larger than the mock-up. Another disclaimer; the team only built one mock-up because the two Test Buildings are exactly mirrored.
Attaching the floor to the column top plates
Attaching the walls to the floor
All the faux SIPs before assembly
The team first assembled wall, roof, floor, and chimney stud formed panels with exterior OSB sheathing on both sides. These acted as stand-in Structurally Insulated Panels (SIPs) which make up the enclosure, structure, and insulation of the Test Buildings. Next, they assembled these faux SIPs atop three shortened columns which have the same thickness and base plates as the Test Building columns.
From base, to columns to floor, to walls, to chimneys, to… dogs?
Groovin’ and Waterproofin’
Next up–keep it dry with tar paper and roofing. Tar paper is a heavy-duty construction paper made with asphalt which repels water. The TMBV team wrapped the entire structure in tar paper in a shingling pattern to create a protective layer. After this, the team started roofing.
From walls to weatherproofing
To minimize heat gain the roofing material is a light-colored, reflective 3/4″ corrugated metal. The metal is attached atop batons which run in parallel with the slope of the roof. This allows the roof to vent heat at the highest point of the structure. If there is one thing this team has learned in two years–hot air rises.
The team installed the flashing along with the roofing. Flashing is a thin piece of impervious material installed to prevent the passage of water into a structure from a joint or as part of a weather-resistant barrier system. The TMBV test buildings use galvanized aluminum as flashing. A large tray prevents water from slipping under the metal roofing while T-shape pieces seal the edges and create the corners.
Finishing Touches
A mini-door frame was fabricated by Brad Schmidt of Superior Metal Works LLC in Newbern, AL. He will also be fabricating the full-size door frames. This was the bit of steel the TMBV team left to a professional–boy does he do nice work! The team painted the door frame with galvanizing paint, as they did the mock-up columns, to see how all the colors of the steel, roofing, flashing, and cladding work together. The door frame installation couldn’t have gone smoother!
Last, but certainly not least, the cypress cladding. 3/4″ 1″x 6″ and 1″ x 8″ cypress boards were sanded and sealed with Kabotz wood bleach. Spaced at 1/4″ the boards created an open joint cladding system, which like the roof, allows for air circulation behind the cladding. Cladding the chimneys and the underside, which will be the cooling porch ceiling, was the trickiest part. Doing the mock-up, however, teaches the students tips and tricks for doing the real thing.
Fin!
Not much more to say, just look at that mock-up!
How’s it look compared to the real thing?
Suprise: Mini-Wall!
The team also completed ANOTHER concrete wall mock-up testing a shiplap joint in between the thermal mass panels. This wall is a proportionally smaller version allowing the team to visualize the pattern on the wall as well as the screw spacing. The shiplap joint, from both a constructability and scientific validity standpoint, is a crowd favorite. Not to mention that craft and beauty…
Roasting in the Sun
On a bright, early, shiny Tuesday all the Rural Studio 2021 Spring Semester student, faculty, and staff enjoyed an in-house Pig Roast. This included an opening ceremony at the beautiful Horseshoe Courtyard, presentations from each team, a ribbon cutting ceremony at Ophelia’s Home, and lots of good food.
After a BBQ lunch, the TMBV team sprang something else heavy on the audience… their project! They had a wonderful discussion with the only outsiders at the celebration; Architects Roy Duvall, of Duvall-Decker in Jackson, MS, and John Forney. It was wonderful to show off all the hard work the students have accomplished since October 2019. From experimentation and coding data to SIPs detailing and steel fabrication these students have continually jumped into waters unknown.
Overall, Pig Roast was wonderful, but the work was not over. Pre-Roast the team installed their columns and finished their mock-ups. Post-Roast they had to complete a paper detailing their TMBV experiments and results for an international building science conference. They worked tightly with Salmaan Craig for the rest of the week. Because, of course, the paper was due that Friday and graduation was also that Friday.
Congrats Grads!
This team just couldn’t function without the variation of personalities and skillsets. No two are alike, and sometimes it’s hard, but they couldn’t be more thankful for ending up on this wild ride together. 4 hours before the paper was due, Cory and Livia scooted to Auburn for graduation. Jeff and Rowe continued working with Salmaan, up until the deadline, for which the other two are eternally grateful. Jeff and Rowe were at graduation in Livia and Cory’s hearts illustrated below. Don’t worry. the whole gang will celebrate together with a classic Cory cook-out. Stay Tuned for the impending construction of the TMBV Test Buildings!