An Earnest Account of Plumbing & Piping

Hark, dear reader, and hear my tale! In my previous journal, I happily announced the arrival of Spring in Hale County. Indeed, the change in temperature was welcome by friend and feline alike. However, I must admit that the boons of Mother Spring cannot be divorced from her burdens. The tempests of March are frequent, strong, and heavy as to turn stable earth into a muck so thick it will suck the sole off one’s boot. My crew has been battling these conditions in a campaign to prepare our site for an approaching concrete pour. Several tasks must be completed before the slab is laid down, the first being to install plumbing & piping. With a slab-on-grade foundation, all of the infrastructure must be installed prior to pouring concrete, this includes the electrical and water mains, as well as waste drains. Our process for this is as follows:

Student hammers in stake
set batter-boards & strings
students dig plumbing trench
dig and grade trenches
prime and glue
student checking slope of a pipe
check your work
completed plumbing on site
revel in a job well done

Although most of the digging was done by hand, we were able to make use of the trencher during a few particularly dry days. The width and depth of the trench that the machine makes is perfect for laying water and electric mains because it can easily dig beneath the frost line in the area. We are grateful when the weather is nice enough to start the trencher up.

student operates trencher
trenching for water main
student laying pex
laying water main

You might be wondering why there is so much plumbing! Reverend Walker’s Home features a main living volume with a kitchen, bathroom, bedroom, and loft. In addition to the main enclosure is a separate room that we have dubbed the “bonus room”. The bonus room is a partially unfinished space that is supplied with plumbing and electrical stub-outs to allow for many possible uses, whether for storage, a home office, a studio, or even another bathroom. The initial investment into infrastructure will enable a homeowner to quickly and easily expand their home.

diagram of bonus room
supplying the bonus room with utilities gives it many possible futures

You will be happy to hear, dear reader, that this step in the process is complete. My next order will be for my crew to set formwork for the slab and column footings! Despite the sky’s grim countenance, spring brings longer days and fresh growth, and morale remains high! The wind is at our backs and I will continue to push this team steadily towards greatness! Alas, dear reader, the magnolia leaves are dripping water onto my head, and I must retire to my chambers for chance I catch a cold.

With affection

Taterhead

The site cat Taterhead
Your orator, Taterhead

Excavation Sensation

Hale’s frozen over! Since then, it has melted, soaked, dried, and soaked again. Classic Hale County. But Myers’ Home team broke ground in the fury of it! You may have heard it here first, folks.

Putting a shovel to the ground takes a lot of prep. First they got the dirt on site conditions. This involved first surveying the area. Though not before saying hello some new, sorry moo, neighbors.

Survey the scene…

To begin, both Myers’ Home and Rev. Walker’s Home teams went to Steve Long’s Survey School at Newbern’s own Morrisette Campus to learn the site level basics.

All learned to set the transit to read site elevations on the story pole — the measuring stick. On site, they will draw a grid to measure points and build a topography map. This team went with 80’ by 90’ at 10’ increments for their site grid.

Recording the first corner of the measured grid on site

A well-informed student home-builder tests their soil strength with the pocket penetrometer. Riley and Judith dug four holes on Myers’ Home site at intervals around the footprint. They then took density measurements at descending points spaced 6” apart. The penetrometer is plunged into the wall of the soil and a reading is taken in tons per sq. ft.

Riley digging a 32″ hole for the pocket penetrometer

The team recorded bearing capacity and observed conditions of the site. This informed a plan for excavation and soil replacement. To make this home stable, they’re building an island of engineered soiled. This raft will be a solid bed of engineered dirt, reliable red soil with a definitive bearing capacity.

After speaking with Joe Farrugia, Rural Studio’s consulting engineer extraordinaire, a plan was in place for site excavation and refilling.

Batter up, batter boards!

The team had to place batter boards though before site excavation. At first glance, batter boards are unassuming scrap pieces. The builders level these to near-perfect tolerance around the site. They hold squared strings marking each edge of the footprint of the building.

With the guidance and helping hands of batter board guru, Steve Long, Judith and Madeline set boards for the excavation crew arriving the very next day!

Can you dig it?

The following morning, the local excavating team made their appearance at sunrise. They removed over 2′ of dirt from the area marked by batter boards. Eight (eight!) truckloads of strong engineered soil then arrived, placed in 6″ lifts in the hole. This new dirt was smoothed to ideal home-building elevation (well above the water table) and left to settle as another wave of rain rolled in.

Ready for the next window of sun, this team will be tamping the new soil, trenching for plumbing and electrical, and preparing for THE SLAB.