mechanicalelectricalplumbing

Get MEPped

Spring has sprung on the 18×18 House site! And with the grass, flowers, and leaves on the trees, new things are springing up inside the house too…

After installing their Pella windows at the start of this semester, the team kept moving with mechanical, electrical, and plumbing rough-ins, or MEP for short. That means pipes and wires!

First up were the drain, waste, and ventilation pipes. The PVC had to be cut and sections fitted together, leveled to slope downwards everywhere, and then taken apart to be glued BACK together. It took some trial and error, but Julie was on top of it.

After drain pipes were glued and checked for leaks, the team moved on to water supply lines. These had to be run to the outside of the house, where eventually the main line will be connected to the water meter.

Student with water line

Inside the house, flexible pipes snake through the walls to a few places. They eventually reach the locations of everything that will use water: the bathroom sink, toilet, shower, kitchen sink, washing laundry, outdoor hose, and refrigerator. Some of the spaces were tight, but once again, Julie saved the day.

Then we ALSO checked all of those pipes for leaks, but this time using air pressure.

Student reading air pressure

Meanwhile, we were also filling the walls with wires to run electricity throughout the house. Wires need to run to every single outlet, switch, and fixture, which can get complicated in a compact space like the 18×18 House.

But fear not! Meagan kept track of all the circuits, which all worked when tested! Phew.

And if that weren’t enough to keep everyone busy, the team has been finalizing some new flashing details for the exterior of the house. The 18×18 House will have about two-thirds of its cladding bumped out by a couple inches to add some dimension to the metal siding. Jake’s on that one!

Look at him. We’re all so proud.

Student with flashing mock-ups

And the FINAL thing the team has done to date… interior finishes! As the insulation and drywall stages approach, the “18s” are deciding on flooring, stair materials, railings, you name it.

The spring evenings in Hale County are setting the 18×18 House aglow every day. Keep an eye out for more changes as spring turns to summer, and as the team gets closer to the finish line!

How To Fill A Wall

The latest is in from the Myers’ Home project site! The team has squared away interior framing and are close to debuting their windows. This means it’s about time for the house to get its nerve center. The Mechanical, Electrical, Plumbing train is leaving the station in Newbern.

Becoming Plumbers…

With Riley offsite in the woodshop working on the custom window units, Madeline and Judith have been at the helm on site for the past few weeks. Madeline is taking the reins on plumbing the whole house, and ducting it too! Judith has got the power alongside her, running electrical wires, installing outlet and switch boxes, sorting circuits, and labeling everything.

The plumbing contains stub-outs to the attic space allowing a bathroom to be built for future generations. These are beside the water heater, also in the attic to save space in the downstairs. Electrical decisions were also based on rooms that could serve different purposes across generations. Dedicated circuits are in place for AC units and the home is treated in zones of use.

Lighting the Way

This also entails a discussion in lighting the house, helped along by a new consultant to the Studio, Thomas Paterson of Lux Populi in Mexico City.

The flexible nature of Myers’ Home doesn’t stop at the plan, section, or material finishes. The team’s been applying their goal of generational expansion and flexibility to the lights in the house too. The home was studied in zones to determine lighting strategies, and tools (fixtures) were chosen to achieve these. The team is working to balance task lighting and spot lighting with the necessary amount of immediate switched light in a space.

The team mirrored lighting and fan locations in each zone for alignment no matter the scheme of flex walls. They then worked to place lights in the core such that it remains a hearth and can be the main source of immediate light in the home.

As these folks press on with electrical work, they’ll begin to test how to optimize the tools they’ve chosen for each flexible space.

It’s Getting Hot in Here…

Drywall looms and Myers’ Home Team must consider all that the wall must hold before it is sealed up. Wires and pipes have been run, the lights are set in their places. It’s time to stuff if full of foam and fiberglass. The insulation line for Myers’ Home is at the roof. This requires five and a half inches of spray-in, open-cell insulation. It’s one of the few jobs that the Studio hires out. Meanwhile, the team put up blocking framing upstairs and left the premises for a day. Upon return, the attic was cool as a cucumber and ready for windows.

The original intention for the home was to install a flash-and-batt insulation system downstairs. However, foam prices are cost-prohibitive and the team moved forward with Rockwool insulation in downstairs walls. Madeline, Riley, and volunteer Bess from Project Horseshoe Farm knocked out the ground floor in just a couple mornings!

Sheetrock City

The team put some quick blocking in place and documented each wall before making the call for sheetrock. The crew arrived first thing and got to it. By lunchtime, the first layer of finishes were all in place. All that remains for drywall is mudding and sanding to smooth everything over.

Neckdown

Much of this happened over the course of Neckdown weekwhere new students knock out work around Hale County using, arguably, everything but their heads. Myers’ Home played host to a few helpers who helped begin more layers of finish materials in and out of the home. Many thanks to new 5th-year students Jackie, Hailey, Davis, Brenton, and Caitlyn, as well as 3rd-years Peter and Laura!

Window units ready to show their faces soon! In the meantime, the home is being battened down with flashing and prepped for siding as the summer slides on by. Check out Myers’ Home team’s brethren over at Rev. Walker’s Home as they also install windows and siding. Or jump to the Thermal Mass and Buoyancy Ventilation crew for some big moves upward! Best to all, over and out.