mep

How To Fill A Wall

The latest is in from the Myers’ Home project site! The team has squared away interior framing and are close to debuting their windows. This means it’s about time for the house to get its nerve center. The Mechanical, Electrical, Plumbing train is leaving the station in Newbern.

Becoming Plumbers…

With Riley offsite in the woodshop working on the custom window units, Madeline and Judith have been at the helm on site for the past few weeks. Madeline is taking the reins on plumbing the whole house, and ducting it too! Judith has got the power alongside her, running electrical wires, installing outlet and switch boxes, sorting circuits, and labeling everything.

The plumbing contains stub-outs to the attic space allowing a bathroom to be built for future generations. These are beside the water heater, also in the attic to save space in the downstairs. Electrical decisions were also based on rooms that could serve different purposes across generations. Dedicated circuits are in place for AC units and the home is treated in zones of use.

Lighting the Way

This also entails a discussion in lighting the house, helped along by a new consultant to the Studio, Thomas Paterson of Lux Populi in Mexico City.

The flexible nature of Myers’ Home doesn’t stop at the plan, section, or material finishes. The team’s been applying their goal of generational expansion and flexibility to the lights in the house too. The home was studied in zones to determine lighting strategies, and tools (fixtures) were chosen to achieve these. The team is working to balance task lighting and spot lighting with the necessary amount of immediate switched light in a space.

The team mirrored lighting and fan locations in each zone for alignment no matter the scheme of flex walls. They then worked to place lights in the core such that it remains a hearth and can be the main source of immediate light in the home.

As these folks press on with electrical work, they’ll begin to test how to optimize the tools they’ve chosen for each flexible space.

It’s Getting Hot in Here…

Drywall looms and Myers’ Home Team must consider all that the wall must hold before it is sealed up. Wires and pipes have been run, the lights are set in their places. It’s time to stuff if full of foam and fiberglass. The insulation line for Myers’ Home is at the roof. This requires five and a half inches of spray-in, open-cell insulation. It’s one of the few jobs that the Studio hires out. Meanwhile, the team put up blocking framing upstairs and left the premises for a day. Upon return, the attic was cool as a cucumber and ready for windows.

The original intention for the home was to install a flash-and-batt insulation system downstairs. However, foam prices are cost-prohibitive and the team moved forward with Rockwool insulation in downstairs walls. Madeline, Riley, and volunteer Bess from Project Horseshoe Farm knocked out the ground floor in just a couple mornings!

Sheetrock City

The team put some quick blocking in place and documented each wall before making the call for sheetrock. The crew arrived first thing and got to it. By lunchtime, the first layer of finishes were all in place. All that remains for drywall is mudding and sanding to smooth everything over.

Neckdown

Much of this happened over the course of Neckdown weekwhere new students knock out work around Hale County using, arguably, everything but their heads. Myers’ Home played host to a few helpers who helped begin more layers of finish materials in and out of the home. Many thanks to new 5th-year students Jackie, Hailey, Davis, Brenton, and Caitlyn, as well as 3rd-years Peter and Laura!

Window units ready to show their faces soon! In the meantime, the home is being battened down with flashing and prepped for siding as the summer slides on by. Check out Myers’ Home team’s brethren over at Rev. Walker’s Home as they also install windows and siding. Or jump to the Thermal Mass and Buoyancy Ventilation crew for some big moves upward! Best to all, over and out.