It’s a Cover-Up: Cladding the Interior and Exterior

History professor Dick Hudgen’s TMBV Test Buildings Sketch!

Right now the Thermal Mass and Buoyancy Ventilation team is all about concrete and cypress. They’ve been busy creating and installing the shiplap jointed, 1-1/8″ thick concrete internal thermal mass panels. These panels line the walls of one of the Test Buildings and create the designed cooling and ventilation effects. With Jeff at the helm of formwork building, they’ve completed three out of four panel pouring phases. The panel-making process is separated into phases, so most of the formwork can be used more than once, eliminating waste. Formwork, or molds, are fabricated with precision in the woodshop. The team installed phase 1 before Cory began his journey to Nova Scotia to participate in a residency with McKay-Lions Sweetapple Architects Ltd. Congratulations Cory, we miss you already!

Also on the agenda as of late; exterior finishes! With weather-proofing complete, the team has taken to installing the cladding part of the ventilated cladding system. This system is completed with 8″ and 6″ cypress boards which are protected with Cabot® Bleaching Stain. The stain also helps the wood age consistently in the sun. With Livia cutting and Jeff and Rowe installing, the cypress siding is flying up!

Unseen are the myriad of other little things the team is finishing up such as electrical and grading. The team is keeping the momentum up so stay tuned to see the buildings fully wrapped!

Panel Production

Panel pouring process: Mix concrete, fill form, transfer to vibrating table, trowel, and finish!

Cypress Siding

Weather Proof and a Roof

Live from the Test Buildings, it’s the Thermal Mass and Buoyancy Ventilation Research Project team. After swiftly assembling the Test Buildings, the graduate team began weatherproofing. The team’s goal is to have the buildings protected from rain quickly so they can get to work on installing the thermal mass panels on the interior. The weatherproofing systems are designed to mitigate heat gain in different ways to eliminate experimental variation.

First, the team covered the buildings in shingled tar paper–a heavy-duty, waterproof construction paper. Next, the team installed battens which create space between the structure and cladding allowing for ventilation and avoiding heat gain. The roof is also ventilated and covered with highly reflective, low albedo corrugated sheet metal. This means the materiality and color of the roof are fighting solar radiation.

Lastly, the team installed the beautiful steel door frames. Turnipseed International donated the steel and Brad of Superior Metals LLC welded the frames Thanks for reading and stay tuned.

Tar Paper and Battens

Roof Battens and Flashing

Roofing Metal

Both roofs complete!

Door Frame