Despite the constant rain and muddy site, the team was able to set the rebar and pour a few days later! By using Steve’s fancy plumb bob, and the previously set batter boards, we were able to find the center of the footings and consequently tie the rebar in the right location. After the rebar was all laid out, pins were staked into the ground (every 5 feet) as a reference where the level of the concrete should be poured to.
Thanks Tuners, Anna, Zak, Charlie, Andrew, and Steve for your help!
As the concrete surface was finished, the levels were checked with the transit.
screen footings 1/2 done!