Those pour, pour foundations!

Live from on top freshly poured foundations, it’s the Thermal Mass and Buoyancy Ventilation Research Project Team! This week the students, with a little help from their friends, completed their Test Building foundations. This included installing rebar and pouring concrete. Let’s get straight to those action shots, huh?

Rebar Retreat

First, Livia’s all time favorite activity, the cutting of the rebar. The team cut sections of rebar for the bottom rebar mat, the top rebar mat, and the vertical pieces that hold the two together.

Next, it’s install time. Comprised of number 5 rebar, the bottom mat is a regular grid. The north-south and east-west pieces are joined with rebar ties. The vertical pieces were hammered into the ground at a consistent elevation. This elevation is 1” lower than the future slab surface. These vertical pieces support the top mat, comprised of number 4 rebar. The top mat only runs between future column locations.

With the rebar installation completed, the TMBV team prepared for the concrete pour. Rowe built bridges to span the foundation excavation holes. The bridges will be used to shovel and trowel the concrete in the middle of the foundations. Jeff helped test bridge durability. Livia prepped her waterproof suit, she’s quite messy and will need to be hosed down with the shovels at the end of the day. Cory practiced his elevation calling as the master of the transit.

The Big Pour

If you find yourself wondering, why do these cute, little buildings need such an intricate foundation? Well, while the volumetric form of the Test Buildings appear small, they are actually quite monumental. Reaching 25’ tall and lifted 7′ 6″ off the ground, the test buildings experience substantial overturning forces which are counteracted by the foundations.

“We get by with a little help from our friends!”

With shovel-armed 5th-years, Steve long calling shots, and Andrew Freear on the chute, the pouring began. Everyone helped move the concrete around the excavation hole until it was about level with the grade pins. Grade pins are orange-painted, vertical pieces that are set to 1/4″ under the slab surface height. When the concrete reaches the grade pins evenly, Rowe and Cory began taking elevation measurements.

In order to deem the elevation, “Good!” the students meticulously move and smooth the concrete. Next, troweling begins once several spot measurements meet the elevation mark. While Livia and Jeff began finishing the surface of the west foundation, the others moved on to the east foundation. Pour, level, rinse, repeat! It is actually a good idea to rinse your shovel in between uses it isn’t ruined by the concrete…

Like most concrete pours, the fashionable ones at least, the TMBV ordered 10% extra concrete. However, the concrete suppliers do not typically take back the extra if it isn’t used. Because all that concrete has got to go somewhere, the TMBV team built formworks that match the size of the concrete scrap they already have. Therefore, they will have plentiful pieces for the design of their Cooling Porch. In the meantime, the mini-slab acts as an executive parking spot for Andrew Freear’s sky-blue Honda FIT.

The Finished Products

Completed east and west foundations
Reserved for Andrew Freear (spikes to be installed later)

Would you look at that—two beautiful foundations ready for curing. And an extra mini slab! The TMBV team could not have completed this feat without the help from the 5th-year students and faculty. The pour went smoothly with no catastrophic events! Next up, construction-wise, the team will install drainage and the steel structure. As always, thanks for stopping by and stay tuned!