Welcome back! Patriece’s Home is finally starting to look like a house! With the foundation work complete, the “leftovers” team started to move on up.





Before framing, the students installed the termite flashing, anchor bolts for their front porch column, and sill gaskets to reduce air infiltration between the slab and the pressure treated base plates.





Then the walls flew up! The team, along with Steve Long (5th-year studio faculty), finished framing the exterior walls and interior bearing walls in two hot Summer days. All of the walls were secured and braced, then the students began making headers for the porch walls and interior closet wall. Looks like this team has liked “stick”ing around Hale County!


And what’s THAT?!? BOOZERBEAM™ out of Anniston, AL, donated a 3.5” x 9.25” x 10’ glulam (glued laminated wood) beam for the team to use as the header in their kitchen! Two students drove to Anniston to pick it up and it works perfectly. A HUGE thank you to the fine folks at BOOZERBEAM™!




As the students were nailing in the top plates that attach all the walls together, the truck arrived with their roof trusses! The team then wrapped their framing in their bottom layer of ZIP sheathing.


The next day the team waved goodbye to Patriece’s children on their first day of school and had a successful morning putting up the trusses! After six hours working on scaffolding, and thanks to the help of Shane Jackson and his crane, the students got to climb down and surprise! It’s a house! The home now stands tall and dignified. Patriece’s kids had a great surprise when they came back at the end of the day.









Since that glorious day the team has been putting blocking in the six foot gap in the trusses and within the exterior walls to so they can begin sheathing the building. The Patriece’s Home team is drying the home in as they get reinvigorated with a new fall semester and new class of Rural Studio students!