exterior sheathing

A Variety of Tasks

Welcome back to my journal, dear reader! This log aims to provide for you an accurate account of the goings-on of Reverend Walker’s Home. Might my words inform or at the very least entertain, then I should be satisfied with its effect. I generally begin these entries with a current description of Hale County as a whole, to provide a context to place the actions of my crew.

As of late, the county has sunk into a thick, languid humidity that prevents large amounts of evaporation. This atmosphere results in dense fogs, oppressive temperatures, swampy ground, and incredible displays of heat lightning. It is not a forgiving climate, to be sure. But it is a West Alabama climate and it’s in it that the special quality of Hale County is made.

My crew labors through these conditions with spirit and humor. They are a hardy bunch indeed. But enough of my musings, dear reader, you must think me sentimental. I have set the team a multitude of tasks to be completed. These range from procuring materials and making final orders to wiring and plumbing the home.

Interior Framing

putting in the interior walls

To separate program and create a loft space, a small number of interior walls were built. These divide the living and core spaces, and divide the core space into a bathroom and kitchen, with a small closet facing the living area. It was not a big task, but it was a good feeling to be done putting the bones of the home together. After getting the sticks up we put together the loft floor and were ready to sheath.

short wall

Sheathing

Reverend Walker’s Home uses an OSB sheathing system wrapped in tar paper. The large sheet material makes it a relatively quick process. It was interesting to experience the space in and around the solid volumes for the first time.

before
after

Mechanical, Electrical, Plumbing

Before we can get drywall up, we need to install the guts of the home. This includes running wire for fixtures and plugs, running water lines, drains, and vents. Reverend Walkers Home uses a PEX water supply system. Getting to focus on some nitty-gritty MEP details was a refreshing change from rough carpentry.

pulling wires
pex
shower fixtures
water wall
stack out the roof!

Lighting Design

Before we can finish up electrical and get insulating, we need to develop a lighting strategy. To help we used the built volumes as 1:1 mockups, and clamped lights around to draw conclusions. We did this for the interior and porch spaces. Interestingly, our initial idea for lighting the exterior was to use the overhead roof as a lighting device. Instead, we found it far more comfortable to reduce the scale by bringing the light down. This has developed into an overall strategy of letting the spaces be grand and open during the day, and shorter, closer to human scale at night.

porch light brought down

Windows

The quest to crank out window units continues. You will recall the custom cypress windows our team have designed. We are eager to complete these and get them in the house so that we can move forward with cladding the home in galvalume r-panel. In total there are five windows of three varieties. The difference being in the proportion of glass to hatch. I walked into the shop for some pictures, this is what I found Addie up to.

scribing

Indeed, my crew has been hard at work. I have put my full trust in them to perform their tasks well. Fortunately for me, they are a good lot which makes management easy, leaving more time to nap. As the Reverend’s home nears completion, look forward to learning about siding, lighting, and finish carpentry. Things are going to begin coming together fast. Alas, dear reader, I must draw an end to this journal entry, for I have grown weary. I believe I will choose the Reverend’s slab porch for today’s restful occasion.

Cordially,

Taterhead

Another Brick in the Pad

New year, new faces! Throughout the Fall semester, the 5th-year, 3rd-year, and graduate students leant helping hands to the Horseshoe Courtyard Team. Spring semester Neckdown week introduced the team to new 3rd-year students. Check out their blog ( 20k Ophelia’s Home) to meet them all! Tasks for Neckdown week at Horseshoe Courtyard included pouring concrete bench footings, cleaning up the site, expanding the brick pad, and sheathing the porch walls.

Since the weather was so great mid-week, the team was able to break up the pours into different days. The next step for the benches is drilling and installing threaded rods into the concrete. The threaded rod will attach to the steel structure which holds the bench seats.

Less Puzzling, More Sanding

The brick pad keeps growing by the day! It’s reached the grinder pump. This allowed the team to install the grinder pump cover structure and infill around it with sand and custom bricks.

In the last few weeks, the team has been keeping track of how “straight” the bricks are being laid. To do this the team pulls string lines to create grids or guides that ensure the bricks are not way out of square by the time the bricks reach the last corner. This sometimes meant going back and straightening some of the already sanded bricks, and choosing which lines to prioritize since these are beautiful but imperfect bricks.

Sheathing the Porch

image of porch with plywood walls
(For the moment being please disregard the rope strands hanging past the screens, will soon be trimmed!)

During Neckdown, the team and helpers added plywood to the porch stud walls. The plywood will be where the exterior gypsum attaches. There will be a set of doors, and a transom window installed on the East side of the porch ( image on the left). The doors will directly connect the interior of the building with the porch, and bring some natural light into the main hallway of the building.