We’ve Been Framed

Things are in motion at 20K Ophelia’s Home! Specifically, the motion of lifting walls up and framing a porch. The exterior walls have been framed and sheathed, and the north and south walls have been lifted into place.

This process was started by measuring and tracing out the stud placement on the edges of the subfloor and laying out all the timber before nailing them together. Occasionally nailing some timber to the subfloor then having to take them out was surely a great way to improve our nail-removing skills. Once the walls had been framed with the studs at 24” on center, and window and door openings were located and framed, the green layer of Zip sheathing was laid on top.

The walls were not the only thing to be framed, as the MEP team was hard at work framing up the porch which proved to be more tedious than expected. In order for the porch to create a level surface with the soon to come interior floor, the joists had to be shortened slightly to accommodate for the layer of wood that will create the porch surface.

Speaking of the porch! There was also some more development of the ideas about a solution for the porch entrance that came from a review with Andrew Freear, Elena Barthel, and assistant director of Tulane’s design build program Emilie Taylor Welty. After much discussion of the three options, which are angle, north, and tongue porch, the 3rd-years were able to narrow it down to the “tongue” option. In order to reach a final porch design, this iteration will go through another process of refinement in the upcoming week.

3rd-years signing off for a jiminy split, see you folks after spring break!